How much does agricultural hedge cutting cost? Real prices from 7 UK jobs

hedgesOctober 202610 min read

Hedge cutting is the second most common job posted through Emmerdale Agriculture this autumn, behind only paddock topping. It is also one of the hardest jobs to find a straight price for. Most guides give a figure per metre and leave it there.

The prices below are real. They are the full prices customers were shown for tractor hedge cutting jobs posted through the network between late September and mid October 2026: seven jobs and 27 separate prices from contractors in Cheshire, Cambridgeshire, Hampshire, Lancashire and Bedfordshire.

It is a small sample and we will keep updating it. But it shows how hedge cutting is actually priced, and why two contractors can look at the same hedge and come back with prices three times apart.

The short answer

The thing to understand is that a tractor-mounted flail cutter works at a steady pace once it is on site. The price is mostly the hours it takes, plus getting there. Short hedges carry a minimum charge. Long hedges are priced per hour or per metre, and the rate falls as the job gets longer.

Real prices, job by job

Each line is one job and every price it received, lowest to highest. "Both sides" means your side, the far side and the top.

Some contractors included VAT and some did not, and a few did not say. We have not adjusted for that. It is worth checking before you compare two prices, because on a £500 job VAT is £100.

The £125 price on the Cheshire job was for two hours' work, and the £290 price on the Bedfordshire job almost certainly was not a price for the whole 700 metres either. When a price looks too good, ask what it covers.

Why the same hedge gets such different prices

The 200 metre hedge in Hampshire drew seven prices, from £405 to £1,035. Same hedge, same brief, and the top price was two and a half times the bottom one.

The usual reasons:

Both customers who accepted a price on these jobs took the lowest or close to it. That is a fair strategy when all the prices are for the same scope. It is a poor one when the cheap price is for two hours and the dear one is for the whole hedge, which is why the next section matters.

What pushes the price up

The jobs that cost the most per metre had something in common: something slowed the cutter down.

When you are allowed to cut

This is the part people get wrong, so it is worth being precise.

In England, since May 2024 the Management of Hedgerows (England) Regulations make it an offence to cut or trim a hedgerow on agricultural land between 1 March and 31 August. The rules cover hedges of 20 metres or more, and shorter ones that join another hedge at each end. They also require a two metre strip from the centre of the hedge where you cannot cultivate, spray or spread fertiliser. The Rural Payments Agency enforces them and has said it will lead with advice rather than penalties. There are exemptions for hedges that overhang a right of way, hedge laying and coppicing, hedges that are dangerous or diseased, and a few others, but you need a reason you can point to.

In Scotland, Wales and Northern Ireland the same closed period of 1 March to 31 August applies under the farm support rules, with slightly different exemptions in each nation.

Private gardens are not covered by the hedgerow regulations. But the Wildlife and Countryside Act 1981 applies everywhere, including gardens, and it is an offence to damage or destroy an active bird's nest. In practice that means nobody sensible cuts a hedge between March and August without checking it first, and most contractors will not.

So the cutting season runs from 1 September to the end of February. Within that window there is a trade-off:

If you can wait, cutting every two or three years rather than every year gives a thicker hedge, more berries and lower bills. Trim the sides to keep it tidy and let the top go a year.

How to get a better price

Flail, saw or hand tools?

A tractor-mounted flail hedge cutter on a reach arm does nearly all agricultural hedge cutting. It chops the growth finely and leaves it where it falls, which is fine on a field edge and needs sweeping on a road. It handles anything up to two or three years' growth and hedges well over 10ft if the arm is long enough.

A saw head or circular saw on the same arm is for thick, woody regrowth, laying hedges back to a line, or taking a hedge down in height after years without a cut. It leaves bigger pieces that usually need clearing.

For a short garden hedge, a hedge trimmer and a trailer can be cheaper than sending a tractor. Many contractors do both, so say what finish you want and let them suggest the kit.

Get prices for your hedge

Tell us about your hedge: where it is, how long it is, how tall, and which sides need doing. It goes to contractors who cover your area, who send back their prices, and you choose. Nothing is booked until you accept a price, and there is no obligation to go ahead.

For the rest of the autumn jobs, see September on the paddock and, for what topping costs, real paddock topping prices.

Quick answers

How much does hedge cutting cost? From real jobs in autumn 2026: a couple of short paddock hedges £345 to £715, a 200 metre hedge mostly £385 to £690, and a 700 metre run mostly £865 to £1,650. Hourly rates were £60 to £75 for a tractor, flail and driver.

How much is hedge cutting per metre? Roughly £2 to £3.50 a metre for a 200 metre hedge and £1.25 to £2.35 a metre for 700 metres. Below about 50 metres the contractor's minimum charge sets the price, not the length.

When can you cut a hedge in the UK? On agricultural land, 1 September to 28 February. Cutting between 1 March and 31 August is an offence in England under the 2024 hedgerow regulations, and barred under farm support rules in Scotland, Wales and Northern Ireland. Gardens are exempt from those rules but not from the law on nesting birds.

Does cutting both sides cost double? Nearly. Each side and the top is a separate pass, so both sides and the top is close to three times the cutting time of one side, plus the same travel.

Why was one price so much cheaper than the others? Usually because it is an hourly rate or a price for part of the job. Ask what it covers before comparing it with a fixed price for the whole hedge.

Want this done for you?

Contractors who cover your area

Describe the job in your own words. We sort the details and pass it to contractors who can actually do it.

Post your job →
Tom OswaldRuns Emmerdale Agriculture, the network behind this site. Writes from the seat of a tractor.
Related

Keep reading

John Deere 6250R with flail mower and collector in a grass field under an autumn sky
seasonalAugust 2026
September on the paddock: the jobs worth doing before the ground turns
hayOctober 2026
Hay, straw and haylage enquiries have nearly tripled. Most are still waiting for a price
seasonalOctober 2026
Winter is coming. Spring is already being planned