The work
What’s involved
The machine is matched to the trench. A mini digger with a narrow bucket suits most pipe and cable runs; a larger excavator handles deep or long trenches and footings; and on open fields a chain trencher can cut a narrow, even trench quickly.
The line is marked out first and the trench dug to the agreed depth, with the soil kept to one side. Once the pipe, cable or duct is in, the trench is backfilled in layers and firmed, topsoil goes back on top, and on grass the turf can be relaid or the line left to grow back.
Depth depends on what the trench is for. Water pipes need to sit deep enough to keep frost off, cables need warning tape above them, and drains need an even fall along their length. Say what is going in and the contractor will dig to suit.
When to do it
Late spring to early autumn, when the ground is dry and firm, gives the cleanest trench and the least mess on grass. Wet clay smears and sticky trenches can collapse.
If someone else is laying the pipe or cable, line the two up so the trench is open for as short a time as possible, especially where stock or people move around.