The work
What’s involved
Water supply pipe, usually blue polyethylene, is laid in a narrow trench deep enough to keep frost off, with joints and a stopcock where you need them and a connection to a trough at the end. On long runs across open ground some contractors pull the pipe in with a mole plough instead of an open trench.
Land drains are perforated pipe laid to an even fall, often bedded and covered in gravel, and led to a ditch or outfall. Getting the fall right is what makes a drain work, so the levels are set before the pipe goes in.
Ducts for electric or data cables go in with warning tape above them so anyone digging later finds the tape before the duct. The cable itself is pulled through and connected by an electrician.
When to do it
Dry ground in late spring to autumn makes for clean trenches, accurate falls and an easy reinstatement. Drainage is easiest to plan after a wet spell, when you have seen where the water sits.
Lay new water supplies before you need them: troughs fed in spring save carrying water all summer.