The work
What’s involved
The trailer is chosen for the load. Bale trailers or flat beds carry round and square bales; tipping trailers or dump trailers move muck, soil, stone and chip; low loaders carry machinery. Say what you are moving and roughly how much.
Loading is the other half. Tell the contractor whether there will be a loader at both ends or whether they need to bring one, because a trailer standing waiting costs time.
Many jobs combine short field-to-yard runs with road miles between sites. Distance, the number of loads and turnaround time at each end set how long the job takes.
When to do it
Haymaking and harvest are peak times, so book bale haulage early. Winter is the season for muck clearance, timber and stone, though field access is often the limit.
Soft ground is the main risk. A loaded trailer will sink and rut wet fields and gateways, so plan field loading for dry spells or use hard standing.